FILE 02POSTURESTAGE-GATED · FALSIFIABLE

Posture

A stage-gated compact-fusion hardware program. Capital tranches tied to measured evidence. Pre-declared no-go signals that terminate the program with clarity.
Reactor architecture, integrated assembly
Operating principles04 ENTRIES
P-01

Stage-gated.

Capital is committed in tranches tied to measured evidence, not to narrative completion. Each stage carries a pre-declared no-go signal that terminates the program with clarity.

S1BenchS2IntegrationS3First plasmaS4MeasureS5Tranche
P-02

Falsifiable.

The thesis tests two questions: whether the pulsed FRC state can be formed, merged, compressed, and diagnosed reproducibly; and whether expansion and recovery hardware can measure useful electrical energy capture without destructive fault behavior.

HypothesisBench testMeasureGo / no-go
P-03

Direct conversion.

Electromagnetic recovery is part of the architecture, not a downstream afterthought. Recovery fraction is a measured quantity at the protected electrical takeoff, not an assumed one.

PlasmaburstExpansionRecoverycoilDC takeoff
P-04

Engineered upstream of plasma.

Bench articles for representative coil families precede first plasma. Subsystem hardware is built, instrumented, and characterized before the integrated machine is committed.

Coil benchC200/210/220CharacterizeIntegrationFirst plasma
Gates06 PRE-DECLARED
Six pre-declared gates. Measurement criteria under NDA.
>> Request data roomProgram briefInvestor brief